The Primary Bathroom at WOW!House 2025

Scope of Work

Bathroom Installation
Construction
Full Rewire

Duration

1 weeks

Location

Chelsea

Construction support and electrical wiring for a design-led installation in Chelsea.

Designed by 1508 London for House of Rohl, the Primary Bathroom used layered materials, textured surfaces and warm, diffused light.

RH assisted with construction and delivered the full electrical wiring during the installation.

Project team

Design: 1508 London
Bathroom brand: House of Rohl
Construction support and electrical wiring: Russell Hewes

Modern residential interior design with open-plan kitchen and dining area

Stay in the loop